
Solar Coaster and Wizard - Solar Coaster/Wizard Connector - By: Russell P

Solar Coaster and Wizard - Terminals - By: Russell P

Solar Coaster and Wizard - Terminals - By: Russell P

Solar Coaster - Up Line - By: Russell P

Solar Coaster - Bottom Station - By: Russell P

Solar Coaster - Top Station - By: Russell P

Solar Coaster - Leaving the Bottom Station - By: Russell P

Solar Coaster - Up Line - By: Russell P

Solar Coaster - Up Line - By: Russell P

Solar Coaster - Lift Maintenaince - By: Russell P

Solar Coaster - Up Line - By: Russell P

Solar Coaster - Top Station (to be moved for P2P) - By: Russell P
Comments:
Work being done to shorten the lift 100 meters to make way for the Peak 2 Peak Gondola
Lift Stats
Operational Status: | Detachable Chairlift |
Status: | Operating |
Capacity per Carrier: | 4 |
Manufacturer: | Doppelmayr |
Length(m): | 1920 |
Vertical(m): | 623 |
Downloading Cap: | Yes |
Carrier Cover: | No |
Hourly Capacity: | 2800 |
Time to ride in one direction: | 8:25 |
# of Carriers: | 160 |
Speed (m/s): | 5.08 |
Built In: | 1987 |
Motor Horsepower: | 800 |